Gatwick North Terminal Premium Drop Off
Tags: infrastructure, steel, fabric, new build
Related projects: London Heathrow Olympic Games Terminal, Heathrow Old Control Tower Demolition
- Client: Balfour Beatty Construction Services
- Photography: Agnese Sanvito




Webb Yates Engineers were responsible for the design of the structural and civil works of this single storey canopy structure and alterations to the existing road layout to facilitate a new premium drop off at London Gatwick Airport's North Terminal. The canopy is located on top of an existing concrete ramp structure and is formed from a series of 11 steel frames with fabric panels spanning between the frames. The canopy spans the width of the ramp and gradually narrows to form a walkway guiding passengers into the terminal building.